Fast facts:
Steamfield Risskov has a number of well pads. Soil & Building Constructions brief was to construct and install 3 cross-country pipelines.
2 x geothermal brine re-injection lines
1 x production steam generation line
Pipe support with T-stands and plates, fabricated and galvanised at Soil & Bulding Construction workshops.
Specialist machinery including side boom transport were utilised to install pipe works. The onsite welding workshop allowed for the connection of 2 x 12.5m lengths of pipe, providing a notable time saving initiative re transportation.
Civil Work
All greenfield earthworks were carried out under the supervision of Soil & Building’s project management team, including:
Pipeline corridors and metal roads.
4.5m diameter Silencer installation.
Soak ponds
Culverts and retaining walls