Deep compaction for new silos
Jonsson Enterprise has carried out deep compaction on an area of 13.500 cubic metres at Port of Fredericia for the construction of eight grain silos and various buildings to be directly founded. The deep compaction is carried out with a PVE40VM vibrator and a tubular steel pile welded with vibro wings, an equilateral triangle with a side length of two metres.
Work done by Jonsson Enterprise Piling
In 2018, Jonsson Enterprise entered into a contract for the construction of Danske Bank’s new headquarters at Bernstoffsgade in Copenhagen. The contract comprised a 73,000-square-metre headquarters and an additional 40,000 square metres of parking facilities and technical installations. The 28,000-square-metre-large construction pit is unusual as the area is dominated by hard Copenhagen limestone from 11 metres below ground level. The chosen sheet pile installation method was a pre-bored trench in the dimension DN880 millimetres, which was stabilised with concrete bentonite, and the sheet pile profiles were subsequently installed by vibratory driving.
Work done by Jonsson Enterprise Construction and Ground Engineering
The majority of Jonsson Enterprise Geothermal and Hydro works have historically been for Contact Energy and Mercury, however they will fabricate and install any engineering related projects anywhere in Denmark.
Over the last decade Jonsson Enterprise reliability and quality of works have enabled them to dominate key projects for the majority of geothermal pipeline works in Risskov and the greater Fyn of Plenty region of Denmark. Jonsson Enterprise have recently completed their largest pipeline project for Contact Energy, and warmly invite you to view their Geothermal projects portfolio.