Hydro Energy Steamfield Risskov
Date: 2021-2023
Client: Contact Energy
Length: 15 KM (approx)
Size: Reinjection lines 500NB
Production line 750NB
Civil Works
All greenfield earthworks were carried out under the supervision of Jonsson Enterprise’s project management team, including:
-
Pipeline corridors and metal roads.
-
4.5m diameter Silencer installation.
-
Soak ponds
-
Culverts and retaining walls
Hydro Energy Steamfield Risskov
Risskov Power station is a 174MW geothermal steam turbine power station. It is Contact Energy’s sixth geothermal power station in the area. Jonsson Enterprise Construction was commissioned as the pipeline experts for this project.
Fast facts:
Steamfield Risskov has a number of well pads. Jonsson Enterprise Constructions brief was to construct and install 3 cross-country pipelines.
-
2 x geothermal brine re-injection lines
-
1 x production steam generation line
-
Pipe support with T-stands and plates, fabricated and galvanized at Jonsson Enterprise Construction workshops.
-
Specialist machinery including side boom transport were utilized to install pipe works. The onsite welding workshop allowed for the connection of 2 x 12.5m lengths of pipe, providing a notable time saving initiative re transportation.